Difference between revisions of "Chiba Kyokuto Refinery"

From A Barrel Full
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 34: Line 34:
 
* 1983 - Hydrocracker and hydrogen unit commissioned
 
* 1983 - Hydrocracker and hydrogen unit commissioned
 
* 2014 - 23,000 bpd Reduction in capacity announced
 
* 2014 - 23,000 bpd Reduction in capacity announced
 +
* 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control
  
 
=== Links ===
 
=== Links ===
 +
# [[Toyo Refinery References]]
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://kpi.co.jp/facilities/joryutou.html Refinery Units], (Japanese)
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
 
# [http://killajoules.wikidot.com/blog:5046 TonenGeneral Group to Optimize Operations]
# [[Toyo Refinery References]]
+
# [https://abarrelfull.blogspot.com/2022/01/execution-of-memorandum-of.html Execution of Memorandum of Understanding regarding Business Integration]
 +
 
  
 
[[category:Refinery]]
 
[[category:Refinery]]
 
[[category:Japan]]
 
[[category:Japan]]
 
[[category:Eneos]]
 
[[category:Eneos]]

Latest revision as of 16:51, 25 January 2022

Summary Information

  • Ownership: Kyokuto, (Exxon Mobil Co. & Mitsui Petrochemical Co., Ltd.)
  • Website: http://kpi.co.jp/
  • Location: Chiba, Japan
  • Capacity: 7.5 million tons/annum & 152,000m bbl/day
  • Nelson Complexity:
  • Refining Depth:

Brief Description

  • A medium sized, medium complexity refinery

Refining Units

  • Atmospheric Distillation, 175.000
  • Vacuum Crude Oil Distillation, 83.000
  • Catalytic Cracking, 34.000
  • Hydro-Cracking, 40.000
  • Catalytic Reforming, 28.000
  • Naphtha Desulfurizaton, 28.000
  • "FCCG Desulfurization", 14.000
  • Middle Distillate Desulfurization, 83.500

Terminal Capacity

  • Crude Oil: 1,100,000 kl
  • Refined Products: 1,510,000 kl

Crude Supply

Products Produced

  • LPG, Gasoline, Jet Fuel, Diesel

Ongoing Projects

  • -

Other Information

  • -

History

  • 1968 - Refinery commissioned with 60,000 bpd capacity
  • 1972 - Capacity increased to 100,000 bpd
  • 1974 - Capacity increased to 150,000 bpd
  • 1983 - Hydrocracker and hydrogen unit commissioned
  • 2014 - 23,000 bpd Reduction in capacity announced
  • 2016 - Merger of Tonen General and JX holdings brought refinery under Eneos control

Links

  1. Toyo Refinery References
  2. Refinery Units, (Japanese)
  3. TonenGeneral Group to Optimize Operations
  4. Execution of Memorandum of Understanding regarding Business Integration