Difference between revisions of "Chennai Manali Refinery Upgrading Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
** Jacobs Engineering Group: Project management consultancy (PMC) and engineering, procurement, construction management (EPCM) | ** Jacobs Engineering Group: Project management consultancy (PMC) and engineering, procurement, construction management (EPCM) | ||
** Punj Lloyd: Sulphur block comprising 2 x 100 TPD Sulphur Recovery Unit including Tail Gas Treatment Unit, 60 m3/hr Sour Water Stripper and 250 TPH capacity Amine Regeneration Unit | ** Punj Lloyd: Sulphur block comprising 2 x 100 TPD Sulphur Recovery Unit including Tail Gas Treatment Unit, 60 m3/hr Sour Water Stripper and 250 TPH capacity Amine Regeneration Unit | ||
+ | ** Engineers India: DHDT and NHT / ISOM Units | ||
* Licences: | * Licences: | ||
** Chevron Lummus Global: Delayed coker | ** Chevron Lummus Global: Delayed coker | ||
+ | |||
=== Refining Units === | === Refining Units === | ||
* Delayed Coker Unit - 50,000 bpd | * Delayed Coker Unit - 50,000 bpd |
Latest revision as of 20:50, 25 March 2020
Contents
Summary Information
- Ownership: Chennai Petroleum Corporation Limited (CPCL) (IOC)
- Website: http://www.cpcl.co.in/
- List of Indian Oil Company Refineries
- Wiki Page: Chennai Manali Refinery
- Location: Manali, Chennai
- Capacity: million tons/annum & bbl/day
- Nelson Complexity:
- Project Stage: Under construction
- Expected Completion: 2020
- Budget:
The Project
- Project Type: Upgrading
- Project Summary: The refinery is in the process of adding residuum upgrading capability. The project involves a delayed coker unit (DCU), a once through hydrocracker revamp, a sulfur recovery unit, a green field coke yard facility, and utilities.
- Main Contractors:
- Jacobs Engineering Group: Project management consultancy (PMC) and engineering, procurement, construction management (EPCM)
- Punj Lloyd: Sulphur block comprising 2 x 100 TPD Sulphur Recovery Unit including Tail Gas Treatment Unit, 60 m3/hr Sour Water Stripper and 250 TPH capacity Amine Regeneration Unit
- Engineers India: DHDT and NHT / ISOM Units
- Licences:
- Chevron Lummus Global: Delayed coker
Refining Units
- Delayed Coker Unit - 50,000 bpd
- hydrocracker revamp,
- sulfur recovery unit
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The project will increase middle distillates
History
- 2010 - Jacobs awarded contract to provide project management consultancy (PMC) and engineering, procurement, construction management (EPCM) services
- 2013 - Punj Lloyd awarded sulphur block contract
Other Information
-