Difference between revisions of "Cartagena Reficar Refinery Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Ecopetrol / Glencore Website: http://www.ecopetrol.com.co/ Wiki Page: Cartagena Reficar Refinery Location: Mamonal of the Cartagena Bay, 30 minu...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information |
− | Ownership: Ecopetrol / Glencore | + | * Ownership: Ecopetrol / Glencore |
− | Website: http://www.ecopetrol.com.co/ | + | * Website: http://www.ecopetrol.com.co/ |
− | Wiki Page: Cartagena Reficar Refinery | + | * Wiki Page: Cartagena Reficar Refinery |
− | Location: Mamonal of the Cartagena Bay, 30 minutes to the west of the Cartagena city on the northern coast of Colombia. | + | * Location: Mamonal of the Cartagena Bay, 30 minutes to the west of the Cartagena city on the northern coast of Colombia. |
− | Capacity: | + | * Capacity: |
− | Before: 4.0 million tons/annum & 78,000 bbl/day | + | ** Before: 4.0 million tons/annum & 78,000 bbl/day |
− | After: 8.25 million tons/annum & 165,000 bbl/day | + | ** After: 8.25 million tons/annum & 165,000 bbl/day |
− | Nelson Complexity: | + | * Nelson Complexity: |
− | Project Stage: | + | * Project Stage: Completed 2016 |
− | + | * Budget: $1.4 Billion (original) | |
− | Budget: $1.4 Billion ( | + | === The Project === |
− | The Project | + | * Project Type: Greenfield Refinery, Plus revamping of existing plant |
− | Project Type: Greenfield Refinery, Plus revamping of existing plant | + | * Project Summary: |
− | Project Summary: | + | ** The construction of a new refinery, taking processing capacity to 165,000 barrels per day, adjacent to REFICAR's refinery in Cartagena |
− | The construction of a new refinery, | + | ** The project includes revamping the existing 80,000 barrel per day refinery. |
− | The project includes revamping the existing | + | ** The overall project will relieve regional refining constraints and will enable REFICAR to produce clean, ultra-low sulfur gasoline and diesel from heavy crude. |
− | The overall project will relieve regional refining constraints and will enable REFICAR to produce clean, ultra-low sulfur gasoline and diesel from heavy crude. | + | * Main Contractors: |
− | Main Contractors: | + | ** CB&I: EPC, engineering, procurement services and construction |
− | CB&I: EPC, engineering, procurement services and construction | + | ** Foster Wheeler: Project Management Consultant |
− | Foster Wheeler: Project Management Consultant | + | ** Kentz: Electrical and instrumentation installation works |
− | Kentz: Electrical and instrumentation installation works | + | * Licences: |
− | Licences: | + | ** Merichem: LPG, Kerosene and Naphtha treatment |
− | Merichem: LPG, Kerosene and Naphtha treatment | + | === Refining Units === |
− | Refining Units | + | * Crude and Vacuum Distillation |
− | Crude and Vacuum Distillation | + | * Fluid Catalytic Cracker |
− | Fluid Catalytic Cracker | + | * Naphtha Hydrotreater |
− | Naphtha Hydrotreater | + | * Diesel Hydrotreater |
− | Diesel Hydrotreater | + | * Hydrocracker |
− | Hydrocracker | + | * Hydrogen Plant |
− | Hydrogen Plant | + | * Sulfur Plant |
− | Sulfur Plant | + | * Delayed Coker |
− | Delayed Coker | + | * HF Alkylation, |
− | HF Alkylation, | + | * C4 Isomerization |
− | C4 Isomerization | + | * Power Generation |
− | Power Generation | + | * Offsites and Utilities |
− | Offsites and Utilities | + | === Terminal Capacity === |
− | Terminal Capacity | + | * Crude Oil: |
− | Crude Oil: | + | * Refined Products: |
− | Refined Products: | + | === Crude Supply === |
− | Crude Supply | + | * Heavy & sour domestic crude |
− | Heavy & sour domestic crude | + | === Products Produced === |
− | Products Produced | ||
- | - | ||
− | History | + | === History === |
− | 2003 - Technip awarded basic design | + | * 2003 - Technip awarded basic design |
− | 2009 - CBI awarded EPC contract | + | * 2009 - CBI awarded EPC contract |
− | 2009 - Foster Wheeler awarded Project Management Consultant contract | + | * 2009 - Foster Wheeler awarded Project Management Consultant contract |
− | 2010 - Merichem technologies chosen | + | * 2010 - Merichem technologies chosen |
− | Other Information | + | * 2016 - Project completed |
+ | === Other Information === | ||
The Export-Import Bank of the United States granted a $2.84 billion direct loan/loan guarantee package for the project | The Export-Import Bank of the United States granted a $2.84 billion direct loan/loan guarantee package for the project | ||
=== Links === | === Links === | ||
Line 60: | Line 60: | ||
# [http://www.ekn.se/Global/Milj%C3%B6pr%C3%B6vade%20aff%C3%A4rer/Reficar%20Cartagena%20Refinery%20Expansion,%20Colombia.pdf Environmental and Social Due Diligence: Reficar Cartagena Refinery Expansion, Colombia] | # [http://www.ekn.se/Global/Milj%C3%B6pr%C3%B6vade%20aff%C3%A4rer/Reficar%20Cartagena%20Refinery%20Expansion,%20Colombia.pdf Environmental and Social Due Diligence: Reficar Cartagena Refinery Expansion, Colombia] | ||
# [http://killajoules.wikidot.com/blog:4170 Kentz consortium awarded US$58m contract in Colombia by CB&I] | # [http://killajoules.wikidot.com/blog:4170 Kentz consortium awarded US$58m contract in Colombia by CB&I] | ||
+ | |||
+ | |||
+ | [[Category:Refinery]] | ||
+ | [[Category:Colombia]] | ||
+ | [[Category:Ecopetrol]] |
Revision as of 07:39, 7 April 2020
=== Summary Information
- Ownership: Ecopetrol / Glencore
- Website: http://www.ecopetrol.com.co/
- Wiki Page: Cartagena Reficar Refinery
- Location: Mamonal of the Cartagena Bay, 30 minutes to the west of the Cartagena city on the northern coast of Colombia.
- Capacity:
- Before: 4.0 million tons/annum & 78,000 bbl/day
- After: 8.25 million tons/annum & 165,000 bbl/day
- Nelson Complexity:
- Project Stage: Completed 2016
- Budget: $1.4 Billion (original)
Contents
The Project
- Project Type: Greenfield Refinery, Plus revamping of existing plant
- Project Summary:
- The construction of a new refinery, taking processing capacity to 165,000 barrels per day, adjacent to REFICAR's refinery in Cartagena
- The project includes revamping the existing 80,000 barrel per day refinery.
- The overall project will relieve regional refining constraints and will enable REFICAR to produce clean, ultra-low sulfur gasoline and diesel from heavy crude.
- Main Contractors:
- CB&I: EPC, engineering, procurement services and construction
- Foster Wheeler: Project Management Consultant
- Kentz: Electrical and instrumentation installation works
- Licences:
- Merichem: LPG, Kerosene and Naphtha treatment
Refining Units
- Crude and Vacuum Distillation
- Fluid Catalytic Cracker
- Naphtha Hydrotreater
- Diesel Hydrotreater
- Hydrocracker
- Hydrogen Plant
- Sulfur Plant
- Delayed Coker
- HF Alkylation,
- C4 Isomerization
- Power Generation
- Offsites and Utilities
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
- Heavy & sour domestic crude
Products Produced
-
History
- 2003 - Technip awarded basic design
- 2009 - CBI awarded EPC contract
- 2009 - Foster Wheeler awarded Project Management Consultant contract
- 2010 - Merichem technologies chosen
- 2016 - Project completed
Other Information
The Export-Import Bank of the United States granted a $2.84 billion direct loan/loan guarantee package for the project
Links
- Refinery Webpage
- The Cartagena Refinery Development Master Plan
- Technip-Coflexip wins a basic design/PMC contract for a refinery project in Colombia
- Foster Wheeler Serves as REFICAR's PMC for REFICAR Refinery Project in Colombia
- CB&I Awarded REFICAR Refinery Project in Colombia
- REFICAR Selects Merichem technologies for treatment of LPG, Jet Fuel, and Spent Caustic
- Ex-Im Bank Gives Preliminary OK For $2.8 Billion Export Financing For Colombian Refinery Project
- Environmental and Social Due Diligence: Reficar Cartagena Refinery Expansion, Colombia
- Kentz consortium awarded US$58m contract in Colombia by CB&I