Difference between revisions of "Binhai LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 27: | Line 27: | ||
=== History === | === History === | ||
− | * | + | * 2019 - AIIB agreed a loan of USD 500m |
=== Other Information === | === Other Information === |
Revision as of 11:18, 21 January 2022
Contents
Summary Information
- Ownership: CNOOC
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- LNG receiving facility with an annual handling capacity of 5 million tons of LNG, 10 LNG storage tanks with a volume of no less than 200,000 cubic meters each, and regasification facility with a maximum daily operating capacity of 60 million cubic meters of natural gas
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2019 - AIIB agreed a loan of USD 500m
Other Information
-