Difference between revisions of "Batangas LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 17: | Line 17: | ||
* Constructor: | * Constructor: | ||
** CB&I are constructing the tanks | ** CB&I are constructing the tanks | ||
− | * | + | ** Whessoe Engineering: ECI Phase for tanks |
=== Ongoing Projects/Project Status === | === Ongoing Projects/Project Status === |
Latest revision as of 16:40, 30 December 2021
Contents
Summary Information
- Ownership: Atlantic Gulf and Pacific Company of Manila Inc. (AG&P)
- Website:
- Location:
- Capacity: million tons/annum
- Status: Under Construction
Brief Description
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- CB&I are constructing the tanks
- Whessoe Engineering: ECI Phase for tanks
Ongoing Projects/Project Status
- The terminal is under construction and is scheduled for completion in 2023
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-