Difference between revisions of "Barrancabaermeja-Santander Refinery"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: Ecopetrol * Website: http://www.ecopetrol.com.co/ * Location: Santander, Colombia * Capacity: 12.5 million tons/annum & 250,000 bbl/da...") |
Abarrelfull (talk | contribs) |
||
Line 22: | Line 22: | ||
* There is an upgrading project that will enable the refinery to increase the conversion factor from 76% to 95% and a greater quantity of heavy crudes will be processed | * There is an upgrading project that will enable the refinery to increase the conversion factor from 76% to 95% and a greater quantity of heavy crudes will be processed | ||
* For details see [[Barrancabermeja Refinery Upgrade Project]] | * For details see [[Barrancabermeja Refinery Upgrade Project]] | ||
+ | * The [[Barrancabermeja Refinery Clean Fuels Project]] was completed in 2010 | ||
=== History === | === History === | ||
* 1994 - FCC project launched | * 1994 - FCC project launched |
Revision as of 06:27, 7 April 2020
Contents
Summary Information
- Ownership: Ecopetrol
- Website: http://www.ecopetrol.com.co/
- Location: Santander, Colombia
- Capacity: 12.5 million tons/annum & 250,000 bbl/day
- Nelson Complexity:
- Refining Depth:
Brief Description
Barrancabaermeja Santander Refinery is the largest in Colombia, supplying 80% of the country's refined product needs
Refining Units
- Atmospheric Distillation
- Catalytic reformer unit - 120,000 BPD
- Soaker Visbreaker - 25,000 BPSD
Terminal Capacity
- Crude Oil:
- Refined Products:
Crude Supply
-
Products Produced
- The refinery is able to produce ultra low sulphur fuels
Projects
- There is an upgrading project that will enable the refinery to increase the conversion factor from 76% to 95% and a greater quantity of heavy crudes will be processed
- For details see Barrancabermeja Refinery Upgrade Project
- The Barrancabermeja Refinery Clean Fuels Project was completed in 2010
History
- 1994 - FCC project launched
- 2004 - Catalytic reformer unit expansion completed
- 2010 - The Barrancabermeja Refinery Clean Fuels Project was completed
Other Information -