Difference between revisions of "Barauni Refinery Expansion Project"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Ownership:  
+
* Ownership: Indian Oil Company
* Website:  
+
* Website: http://www.iocl.com/
 +
* List of [[Indian Oil Company Refineries]]
 
* Wiki Page: [[Barauni Refinery]]
 
* Wiki Page: [[Barauni Refinery]]
* Location:
+
* Location: Barauni, Bihar, iEastern India
* Capacity: million tons/annum & 00,000 bbl/day
+
* Capacity:  
 +
** Before: 6.0 million tons/annum & 120,000 bbl/day
 +
** After: 9.0 million tons/annum & 180,000 bbl/day
 
* Nelson Complexity:
 
* Nelson Complexity:
* Project Stage:
+
* Project Stage: Under construction
 
* Expected Completion: 2023
 
* Expected Completion: 2023
 
* Budget:
 
* Budget:
  
 
=== The Project ===
 
=== The Project ===
* Project Type:
+
* Project Type: The BR9 Expansion project shall enhance refinery capacity from 6 MMTPA to 9 MMTPA and will add petrochemicals such as Polypropylene
* Project Summary:
+
* Project Summary:  
 
* Main Contractors
 
* Main Contractors
** McDermott: EPCC contract for a new diesel hydrotreating unit and associated facilities
+
** McDermott: EPCC contract for a new diesel hydrotreating unit and associated facilities & new naptha hydrotreating unit and isomerization units with associated facilities
 +
** Technip: EPCC contract covers the installation of a new Once-through Hydrocracker Unit (OHCU)
 
* Licences
 
* Licences
 
**
 
**
  
 
=== Refining Units ===
 
=== Refining Units ===
*  
+
* Once-through Hydrocracker Unit (OHCU)
 +
* Diesel hydrotreating unit
 +
* Naptha hydrotreating unit
 +
* Isomerization unit with associated facilities
 +
 
 
=== Terminal Capacity ===
 
=== Terminal Capacity ===
 
* Crude Oil:
 
* Crude Oil:
Line 29: Line 37:
 
=== History ===
 
=== History ===
 
* 2020 - Final investment decision
 
* 2020 - Final investment decision
* 2021 - McDermott awarded EPCC contract for a new diesel hydrotreating unit and associated facilities
+
* 2021 - McDermott awarded EPCC contracts for a new diesel hydrotreating unit, new naptha hydrotreating unit, new isomerization unit and associated facilities
  
 
=== Other Information ===
 
=== Other Information ===
Line 35: Line 43:
 
=== Links ===
 
=== Links ===
 
# [https://abarrelfull.blogspot.com/2021/11/iocl-awards-mcdermott-two-epcc-refinery.html IOCL Awards McDermott Two EPCC Refinery Contracts]
 
# [https://abarrelfull.blogspot.com/2021/11/iocl-awards-mcdermott-two-epcc-refinery.html IOCL Awards McDermott Two EPCC Refinery Contracts]
 +
# [https://abarrelfull.blogspot.com/2021/11/mcdermott-awarded-additional-epcc.html McDermott Awarded Additional EPCC Project for Barauni Refinery Expansion]
 +
# [https://abarrelfull.blogspot.com/2022/12/technip-energies-awarded-significant.html Technip Energies Awarded a Significant Contract by Indian Oil Corporation to Upgrade the Barauni Refinery in India]
  
  

Latest revision as of 14:54, 3 December 2022

Summary Information

  • Ownership: Indian Oil Company
  • Website: http://www.iocl.com/
  • List of Indian Oil Company Refineries
  • Wiki Page: Barauni Refinery
  • Location: Barauni, Bihar, iEastern India
  • Capacity:
    • Before: 6.0 million tons/annum & 120,000 bbl/day
    • After: 9.0 million tons/annum & 180,000 bbl/day
  • Nelson Complexity:
  • Project Stage: Under construction
  • Expected Completion: 2023
  • Budget:

The Project

  • Project Type: The BR9 Expansion project shall enhance refinery capacity from 6 MMTPA to 9 MMTPA and will add petrochemicals such as Polypropylene
  • Project Summary:
  • Main Contractors
    • McDermott: EPCC contract for a new diesel hydrotreating unit and associated facilities & new naptha hydrotreating unit and isomerization units with associated facilities
    • Technip: EPCC contract covers the installation of a new Once-through Hydrocracker Unit (OHCU)
  • Licences

Refining Units

  • Once-through Hydrocracker Unit (OHCU)
  • Diesel hydrotreating unit
  • Naptha hydrotreating unit
  • Isomerization unit with associated facilities

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

-

Products Produced

-

History

  • 2020 - Final investment decision
  • 2021 - McDermott awarded EPCC contracts for a new diesel hydrotreating unit, new naptha hydrotreating unit, new isomerization unit and associated facilities

Other Information

-

Links

  1. IOCL Awards McDermott Two EPCC Refinery Contracts
  2. McDermott Awarded Additional EPCC Project for Barauni Refinery Expansion
  3. Technip Energies Awarded a Significant Contract by Indian Oil Corporation to Upgrade the Barauni Refinery in India