Difference between revisions of "Bakken Crude Express Pipeline Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 9: | Line 9: | ||
* Length: kilometres (1,300 miles) | * Length: kilometres (1,300 miles) | ||
* Capacity: barrels of oil per day | * Capacity: barrels of oil per day | ||
− | * Crude Type: | + | * Crude Type: [[Bakken Crude Oil]] |
+++ Brief Description | +++ Brief Description |
Latest revision as of 13:18, 25 March 2024
Summary Information
- **Cancelled**
- Source: North Dakota
- Destination: Cushing, Oklahoma
- Ownership: ONEOK Partners
- Website: http://www.oneokpartners.com/
- Length: kilometres (1,300 miles)
- Capacity: barrels of oil per day
- Crude Type: Bakken Crude Oil
+++ Brief Description
- A 1,300-mile crude-oil pipeline with the capacity to transport 200,000 barrels per day (bpd). The Bakken Crude Express Pipeline will transport light-sweet crude oil from the Bakken Shale in the Williston Basin in North Dakota to the Cushing, Okla., crude-oil market hub.
+++ Pipeline Status
- Pipeline was to be completed in 2015, but has been cancelled
+++ History
- 2012 - Project announced
- 2012 - ONEOK Partners Announces Open Season
- 2012 - ONEOK Partners Announces cancellation of the project
+++ Other Information
- The proposed pipeline route will be well-positioned to transport crude-oil production from the [[[Niobrara Shale Oil Field | Niobrara Shale]]]
+++ Links