Difference between revisions of "Bahrain Floating LNG Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (→Links) |
Abarrelfull (talk | contribs) |
||
Line 22: | Line 22: | ||
=== History === | === History === | ||
* 2015 - Contracts awarded | * 2015 - Contracts awarded | ||
+ | * 2020 - Terminal completed | ||
+ | |||
=== Other Information === | === Other Information === | ||
- | - |
Revision as of 09:55, 1 February 2020
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status: In operation
Brief Description
- The project will comprise a Floating Storage Unit (FSU), an offshore LNG receiving jetty and breakwater, an adjacent regasification platform, subsea gas pipelines from the platform to shore, an onshore gas receiving facility, and an onshore nitrogen production facility.
The project will have an initial capacity of 400 million standard cubic feet per day (expandable to 800 million standard cubic feet per day)
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
- GS Engineering & Construction: EPC contractor
- Teekay LNG: Supply of the FSU vessel
Ongoing Projects/Project Status
- The terminal was commissioned in 201X
Suppliers / Customers
- Suppliers:
- Customers:
History
- 2015 - Contracts awarded
- 2020 - Terminal completed
Other Information
-