Difference between revisions of "Arctic LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
Line 24: Line 24:
 
* Suppliers: Gas is to be supplied from the [[Utrenneye Gas and Condensate Field]]
 
* Suppliers: Gas is to be supplied from the [[Utrenneye Gas and Condensate Field]]
 
* Customers:
 
* Customers:
 +
** Zhejiang Energy; 1 mn tons per annum for 15 years
  
 
=== History ===
 
=== History ===

Revision as of 09:58, 19 January 2022

Summary Information

  • Ownership: Novatek, Total, CNPC, CNOOC
  • Website: https://www.novatek.ru/
  • Location: Gydan peninsula, Russia
  • Capacity: 19.8 million tons/annum
  • Status: Under Construction

Brief Description

  • A large onshore liquefaction terminal that will be built in three trains
  • Arctic LNG 2 production will be delivered to international markets by a fleet of ice-class LNG carriers that will be able to use the Northern Sea Route and the transshipment terminal in Kamchatka for cargoes destined for Asia and the transshipment terminal close to Murmansk for cargoes destined for Europe.
  • In addition to LNG the project will have gas condensate production capacity of 1.6 million tons per annum

Technical Details

  • Storage capacity:
  • Constructor:
    • TechnipFMC: Engineering, Procurement and Construction (EPC)
  • Licensor:

Ongoing Projects/Project Status

  • Commissioning of the first train is expected in 2023

Suppliers / Customers

History

  • 2018 - Front-end engineering design (FEED) was completed
  • 2019 - Final investment decision

Other Information

  • -

Links

  1. Russia: Launch of the Giant Arctic LNG 2 Development
  2. TechnipFMC Awarded a Major Contract for the Arctic LNG 2 Project in West Siberia
  3. NOVATEK and Zhejiang Energy Sign Sales and Purchase Agreement on Long-Term LNG Supply