Difference between revisions of "Arctic LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * A large onshore liquefaction terminal that will be built in three trains |
=== Technical Details === | === Technical Details === |
Revision as of 09:48, 19 January 2022
Contents
Summary Information
- Ownership: Novatek, Total, CNPC, CNOOC
- Website: https://www.novatek.ru/
- Location: Gydan peninsula, Russia
- Capacity: 19.8 million tons/annum
- Status: Under Construction
Brief Description
- A large onshore liquefaction terminal that will be built in three trains
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers:
- Customers:
History
- -
Other Information
- -