Difference between revisions of "Annova LNG Export Terminal Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 8: | Line 8: | ||
=== Brief Description === | === Brief Description === | ||
− | * | + | * The project was to have three stages of development, with each capable of producing two million tons of LNG a year for at least six million tons annually when complete. |
=== Technical Details === | === Technical Details === |
Revision as of 09:56, 14 January 2022
Contents
Summary Information
- Ownership: Exelon
- Website: https://www.exeloncorp.com/
- Location: Port of Brownsville
- Capacity: 6.0 million tons/annum
- Status: Cancelled
Brief Description
- The project was to have three stages of development, with each capable of producing two million tons of LNG a year for at least six million tons annually when complete.
Technical Details
- Storage capacity:
- Constructor:
- Licensor:
Ongoing Projects/Project Status
- Commissioning is expected in 202X
Suppliers / Customers
- Suppliers:
- Customers:
History
- -
Other Information
- -
Links
- -