Difference between revisions of "Alexandroupolis LNG Terminal"

From A Barrel Full
Jump to navigation Jump to search
 
(7 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
* Website: http://www.gastrade.gr/
 
* Website: http://www.gastrade.gr/
 
* Location: Alexandroupolis, Northern Greece
 
* Location: Alexandroupolis, Northern Greece
* Capacity: million tons/annum
+
* Capacity: 4.3 million tons/annum
 
* Status: Under construction
 
* Status: Under construction
  
Line 11: Line 11:
 
* The FSRU will have an overall delivery capacity 5.5 billion cubic meters/bcm per year. The subsea and onshore sections of the gas transmission pipeline, of 24 km and 4 km respectively, will transmit the gas from the floating unit to the Greek natural gas network.  
 
* The FSRU will have an overall delivery capacity 5.5 billion cubic meters/bcm per year. The subsea and onshore sections of the gas transmission pipeline, of 24 km and 4 km respectively, will transmit the gas from the floating unit to the Greek natural gas network.  
 
* The connection point of the pipeline will be the Kipi‐Komotini branch of the National Natural Gas System of Greece (“NNGS”), at a new entry point from which the natural gas from the floating unit will be transmitted to the NNGS.
 
* The connection point of the pipeline will be the Kipi‐Komotini branch of the National Natural Gas System of Greece (“NNGS”), at a new entry point from which the natural gas from the floating unit will be transmitted to the NNGS.
 +
* Gas from the terminal can be supplied to Bulgaria, via the [[Greece-Bulgaria Interconnector ICGB]]
  
 
=== Technical Details ===
 
=== Technical Details ===
  
* Storage capacity:  
+
* Storage capacity: 153,500 M3
 
* Unloading capacity:
 
* Unloading capacity:
* Send out capacity:
+
* Send out capacity: 22 million cubic metres per day
 
* Constructor:
 
* Constructor:
 +
** '''Seatrium:''' For the FSRU - Refurbishment and life extension works, engineering and procurement, fabrication, and installation of a new regasification skid, as well as supporting systems such as boilers, offloading, electrical and automation systems.
  
 
=== Ongoing Projects/Project Status ===
 
=== Ongoing Projects/Project Status ===
 
+
* The terminal is to be commissioned in [[LNG Terminal Projects to be Completed in 2023 | 2023]]
  
 
=== Suppliers / Customers ===
 
=== Suppliers / Customers ===
Line 26: Line 28:
 
* Suppliers:
 
* Suppliers:
 
* Customers:
 
* Customers:
 +
 
=== History ===
 
=== History ===
  
 
* 2021 - EU approves state aid for the project
 
* 2021 - EU approves state aid for the project
 +
* 2022 - Final investment decision
 +
* 2023 - The FSRU is completed
  
 
=== Other Information ===
 
=== Other Information ===
Line 35: Line 40:
 
=== Links ===
 
=== Links ===
 
# [https://lng-news.blogspot.com/2021/06/commission-approves-1667-million-greek.html Commission approves €166.7 million Greek public support for construction of LNG terminal in Alexandroupolis]
 
# [https://lng-news.blogspot.com/2021/06/commission-approves-1667-million-greek.html Commission approves €166.7 million Greek public support for construction of LNG terminal in Alexandroupolis]
 +
# [https://lng-news.blogspot.com/2022/01/gastrade-adopts-final-investment.html Gastrade adopts the Final Investment Decision for the Alexandroupolis Independent Natural Gas System (INGS)]
 +
# [https://lng-news.blogspot.com/2023/11/seatrium-delivers-greeces-first-fsru.html Seatrium Delivers Greece’s First FSRU]
 +
# [https://lng-news.blogspot.com/2023/12/gastrades-fsru-alexandroupolis-arrived.html Gastrade’s FSRU “ALEXANDROUPOLIS” arrived in Greece]
  
 
[[category:LNG]]
 
[[category:LNG]]
 
[[category:Greece]]
 
[[category:Greece]]

Latest revision as of 12:41, 18 December 2023

Summary Information

  • Ownership: Gastrade
  • Website: http://www.gastrade.gr/
  • Location: Alexandroupolis, Northern Greece
  • Capacity: 4.3 million tons/annum
  • Status: Under construction

Brief Description

  • The Floating Storage Regasification Unit (“FSRU”) of the new terminal will be stationed approximately 17.6 km from the town of Alexandroupolis in Northern Greece, at an offshore distance of approximately 10 km from the nearest shore.
  • The FSRU will have an overall delivery capacity 5.5 billion cubic meters/bcm per year. The subsea and onshore sections of the gas transmission pipeline, of 24 km and 4 km respectively, will transmit the gas from the floating unit to the Greek natural gas network.
  • The connection point of the pipeline will be the Kipi‐Komotini branch of the National Natural Gas System of Greece (“NNGS”), at a new entry point from which the natural gas from the floating unit will be transmitted to the NNGS.
  • Gas from the terminal can be supplied to Bulgaria, via the Greece-Bulgaria Interconnector ICGB

Technical Details

  • Storage capacity: 153,500 M3
  • Unloading capacity:
  • Send out capacity: 22 million cubic metres per day
  • Constructor:
    • Seatrium: For the FSRU - Refurbishment and life extension works, engineering and procurement, fabrication, and installation of a new regasification skid, as well as supporting systems such as boilers, offloading, electrical and automation systems.

Ongoing Projects/Project Status

  • The terminal is to be commissioned in 2023

Suppliers / Customers

  • Suppliers:
  • Customers:

History

  • 2021 - EU approves state aid for the project
  • 2022 - Final investment decision
  • 2023 - The FSRU is completed

Other Information

-

Links

  1. Commission approves €166.7 million Greek public support for construction of LNG terminal in Alexandroupolis
  2. Gastrade adopts the Final Investment Decision for the Alexandroupolis Independent Natural Gas System (INGS)
  3. Seatrium Delivers Greece’s First FSRU
  4. Gastrade’s FSRU “ALEXANDROUPOLIS” arrived in Greece