Al Jurf Oil Field
Revision as of 11:11, 2 December 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Total * Country: Libya * Location: Offshore Block 137 * Production start: 2003 * Partners: Wintershall (12.5%) NOC (50%) * Type: Oil * Estima...")
Summary Information
- Operator: Total
- Country: Libya
- Location: Offshore Block 137
- Production start: 2003
- Partners: Wintershall (12.5%) NOC (50%)
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- The Al Jurf field development consists of the BD-1 wellhead platform with 10 production wells connected to a floating production storage offloading (FPSO) vessel, Farwah FPSO.
- The FPSO has a storage capacity of more than 900,000 barrels. Production will be 40,000 barrels of oil per day once the field reaches plateau
+++ Contractors
- **Saipem:** Wellhead platform and flowlines - FEED
- **Tecon:** Basic and detailed structural design of the 8 leg drilling and production deck for BD1 platform
- **Cantieri Rosetti:** BD 1 - Jacket
- **Seaway Heavy Lifting:** BD-1 Platform installation
+++ History
- 1975 - Al Jurf discovered
- 2002 - BD-1 Platform installed
- 2003 - Production starts
+++ Geology
+++ Links