Adria LNG Terminal
Summary Information
Ownership: Adria LNG, E-on, OMV, Total Website: http://www.adria-lng.hr/ Location: Croatia Capacity: 10 billion cubic metres (bcm) per annum Status: Planned Brief Description
Final capacity of the terminal corresponds to 10 billion Ncbm/year. The terminal facility comprises : a LNG carrier berthing, unloading facilities, full containment storage tanks (3 x 120.000 cbm), vaporisation and transportation facilities Technical Details
Storage capacity: Unloading capacity: It will be designed for LNG tankers carrying up to 265,000 cubic metres. Send out capacity: Constructor: Tractabel: Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications Ongoing Projects/Project Status
Final investment decision is yet to be made The Croatian government is considering their own competing project Suppliers / Customers
Suppliers: Customers: History
1993 - Tractabel awarded contract for Site selection / Risk Assessments / Shipping Study / Front-End - Basic Design / EPC Specifications 2007 - Conceptual engineering study prepared 2009 - Sofregaz awarded FEED contract Other Information
-
Links
Tractebel Engineering LNG References Croatia wants concrete moves on LNG terminal Total Studies an LNG Receiving Terminal in Croatia Krk Island - CROATIA - LNG TERMINAL - FEED