Difference between revisions of "Abu Cluster Oil Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: Petronas * Country: Malaysia * Location: PM 318 * Production start: 2007 * Partners: Newfield * Type: Oil / Gas * Estimated Reserves: * Produ...")
 
Line 10: Line 10:
  
 
+++ Description
 
+++ Description
* The field utilises the Abu-A MiRIPP platform and the [[[Abu FSO]]]
+
* The field utilises the Abu-A MiRIPP platform and the [[Abu FSO]]
  
 
+++ Contractors
 
+++ Contractors
* **THHE:** ABU-A TOPSIDE
+
* '''THHE:''' ABU-A TOPSIDE
  
 
+++ History
 
+++ History
Line 24: Line 24:
 
+++ Links
 
+++ Links
 
# [http://www.fpsoventures.com/abu/index.html Abu FSO]
 
# [http://www.fpsoventures.com/abu/index.html Abu FSO]
# [[[Jotun Asia Platform References]]]
+
# [[Jotun Asia Platform References]]
# [[[TH Heavy Engineering Platform References]]]
+
# [[TH Heavy Engineering Platform References]]
 
# [http://killajoules.wikidot.com/archive:newfield-to-participate-in-malaysian-pscs-company-es Newfield to Participate in Malaysian PSCs; Company Establishes New International Focus Area]
 
# [http://killajoules.wikidot.com/archive:newfield-to-participate-in-malaysian-pscs-company-es Newfield to Participate in Malaysian PSCs; Company Establishes New International Focus Area]
 
# [http://killajoules.wikidot.com/archive:newfield-reports-second-quarter-2007-financial-and-o Newfield Reports Second Quarter 2007 Financial and Operating Results Company Updates Production Guidance]
 
# [http://killajoules.wikidot.com/archive:newfield-reports-second-quarter-2007-financial-and-o Newfield Reports Second Quarter 2007 Financial and Operating Results Company Updates Production Guidance]

Revision as of 10:13, 20 December 2023

Summary Information

  • Operator: Petronas
  • Country: Malaysia
  • Location: PM 318
  • Production start: 2007
  • Partners: Newfield
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field utilises the Abu-A MiRIPP platform and the Abu FSO

+++ Contractors

  • THHE: ABU-A TOPSIDE

+++ History

  • 2004 - PSC signed for block
  • 2007 - Production started

+++ Geology

+++ Links

  1. Abu FSO
  2. Jotun Asia Platform References
  3. TH Heavy Engineering Platform References
  4. Newfield to Participate in Malaysian PSCs; Company Establishes New International Focus Area
  5. Newfield Reports Second Quarter 2007 Financial and Operating Results Company Updates Production Guidance