AURA Oil And Gas Processing References
Revision as of 07:06, 12 December 2023 by Abarrelfull (talk | contribs)
- Liwan 3-1 Gas Field
- China
- CNOOC
- 4x12000kW - WHRU
- Halfaya Oil Field
- IRAQ
- CPE - IRAQ
- 3x8000kW - Fired boiler - Phase I
- Madura BD Offshore Gas and Condensate Field
- Indonesia
- CNOOC Indonesia
- 4x12000kW (3x41 MBtu/h) (Gas fired)
- 4x10000kW (4x34 MBtu/h) (Diesel, Crude Oil and Gas Fired)
- QHD326 FPSO
- Shanghai Petro-chemical, Polyester Production
- 12000kW (41 MBtu/h) (Heavy Oil fired)
- Beijing Yanshan Company Refinery
- China
- SINOPEC Yanshan Petro-chemical
- 2x3000kW (2x10 MBtu/h) (Diesel Oil, Gas fired)
- CNPC (International) Sudan Fula Oil Field
- 2x6100kW (2x21 MBtu/h) (Gas fired)
- Luda 27-2 And LD 32-2 Oil Fields
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (WHRU)
- Block 3 and 7 Oil Fields
- South Sudan
- PDOC
- 2x4x13200kW (2x4x45 MBtu/h) (Diesel oil & Crude oil fired)
- Kela-2 Gas Field
- China
- CNPC
- 2x6700kW (2x23 MBtu/h) (Gas fired)
- Qinhuangdao Offshore Oil Field
- Nanbao Offshore Oil Field
- China
- CNOOC
- 3x5000kW (3x17 MBtu/h) (Gas,diesel oil & crude oil fired)
- Bozhong 28-2S Oil Fields
- China
- CNOOC
- 3x6000kW (3x20 MBtu/h) (WHRU)