Vampire, Viscount and Valkyrie Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Harbour Energy
  • Country: UK
  • Location: 049/16
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Vampire development consists of a single a normally unmanned minimum facility fixed steel Platform
  • The Viscount development will consists of three production wells, a normally unmanned minimum facility fixed steel Platform and a subsea pipeline tied in to the Vampire platform
  • Valkyrie consists of a single extended reach well into the Valkyrie reservoir from the existing Vampire platform
  • Gas is transported via the Lincolnshire Offshore Gas Gathering System (Loggs) to the Theddlethorpe Gas Processing Plant

Contractors

  • **Odebrecht:** T&I for Vampire platform

History

  • 1998 - Vampire development approval granted
  • 2002 - Development approval for Viscount
  • 2004 - Valkyrie granted development approval
  • 2019 - Chrysaor acquired Conocophillips's stake in the field
  • 2021 - Premier Oil and Chrysaor merge to create Harbour Energy

Geology

Links

  1. List Of Oil and Gas Production Platforms In The UK
  2. UK Oil and Gas Fields by Approval Date
  3. Seaway Heavy Lifting Europe Oil And Gas References
  4. ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
  5. Harbour Energy to be admitted to trading