Uaru FPSO

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Name: Uaru FPSO
  • Field: Uaru_Oil_Field
  • Country: Guyana
  • Ownership:
  • Website:
  • Field Operated By: Exxon
  • Capacity: 250,000 bpd
  • Year of Completion: 2026

Brief Description

  • The Uaru FPSO is named ‘Errea Wittu’, which means ‘abundance’
  • The FPSO will have a topside designed to produce approximately 250,000 barrels of oil per day and will have associated gas treatment capacity of 540 million cubic feet per day, water injection capacity of 350,000 barrels per day and produced water capacity of 300,000 barrels per day.
  • It will be able to store around 2 million barrels of crude oil.

/* The FPSO will serve the Snoek, Mako and Uaru resources in the Stabroek block

Contractors

  • Modec: Front End Engineering and Design & EPCI
  • SOFEC: Spread Mooring System
  • Seatrium: Installation and integration of topside modules

Status

  • Installation

History

  • 2022 - Modec awarded Front End Engineering and Design
  • 2023 - EPCI phase launched following FID
  • 2026 - FPSO arrives in Guyana

Other Information

  • -

Links

  1. MODEC awarded FEED contract for ExxonMobil’s “Uaru” project in Guyana
  2. MODEC’s Uaru FPSO Project for offshore Guyana proceeds to EPCI Phase
  3. Seatrium Secures FPSO Topsides Integration Contract with MODEC
  4. MODEC Announces Arrival of FPSO Errea Wittu in Guyana