Anning and Somerville Gas Fields
Jump to navigation
Jump to search
Summary Information
- Operator: Hartshead
- Country: UK
- Location: Southern North Sea
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves: 2P Gas Reserves of 301.5 Bcf (52 MMboe).
- Production Volume:
Description
- The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.
- These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network. A pipeline to the Leman Gas Fields is being considered
- Final Investment Decision (FID) is expected in 2023 and first gas in late 2024
Contractors
- Petrofac: offshore construction support for the subsea pipeline tie-in activities on the Corvette to Leman Alpha export pipeline, communication connections, pipework for system control and export route options and control room integration.
History
- 2022 - Submission made to the North Sea Transition Authority
- 2022 - Petrofac selected for engineering study