CNPC LNG Terminals
Revision as of 17:23, 30 July 2024 by Abarrelfull (talk | contribs) (Created page with "Introduction * CNPC and its subsidiary PetroChina are very active in both ends of the supply chain. * In 2011 their first import terminals, Dalian and Jiangsu were commissi...")
Introduction
- CNPC and its subsidiary PetroChina are very active in both ends of the supply chain.
- In 2011 their first import terminals, Dalian and Jiangsu were commissioned
- This was followed by a small peak shaving plant at Ansai, in 2012 and Tangshan (Caofeidian) in 2015
- The company has stakes in a number of LNG export projects in Australia and elsewhere
++++ Export Terminals
++++ Import Terminals
- Ansai LNG Terminal
- Dalian LNG Terminal
- Jiangsu LNG Terminal
- Shenzhen LNG Terminal
- Tangshan LNG Terminal
++++ Relevant Links