Triton Oil and Gas Fields

From A Barrel Full
Revision as of 16:46, 30 July 2024 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Dana
  • Country: UK
  • Location: Central North Sea
  • Production start: 2000
  • Partners: Dana (51.966%), Shell UK (26.42%), Esso Exploration and Production UK Limited (20%) and Endeavour (1.614%)
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • Kvaerner: Overall construction contract
  • Samsung Heavy Industries: Hull Construction
  • Sembawang Shipyard: Modification

History

  • 1998 - Government approval for Bittern & Guillemot
  • 2000 - First oil produced
  • 2002 - Approval for Clapham
  • 2012 - Dana becomes operator of Triton FPSO
  • 2017 - Tailwind Energy acquired stakes from Shell and Exxon
  • 2023 - Serica acquired Tailwind

Geology

Links

  1. UK Oil and Gas Fields by Approval Date
  2. First Oil Through Triton FPSO
  3. Dana becomes operator of Triton FPSO
  4. Tailwind Energy buys out Shell, Exxon at Triton
  5. Serica Energy PLC Proposed Acquisition of Tailwind Energy Investments Ltd