Beacon Port LNG Terminal

From A Barrel Full
Revision as of 15:14, 6 July 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Ownership: Conoco * Website: http://www.conocophillips.com/ * Location: Offshore Louisiana * Capacity: million tons/annum * Status: Cancelled +++ Br...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

+++ Brief Description

  • Beacon Port was planned to consist of two concrete gravity-based LNG storage tanks, regasification equipment, docking platforms and other unloading and operational equipment.
  • Beacon Port was to send gas to the mainland through 46 miles of new pipeline and a riser platform that will connect to existing pipelines approximately 29 miles south-southeast of Johnson's Bayou, La.
  • Existing pipelines were to bring the gas to shore.

+++ Technical Details

  • Storage capacity:
  • Unloading capacity:
  • Send out capacity:
  • Constructor:


+++ Ongoing Projects/Project Status

+++ Suppliers / Customers

  • Suppliers:
  • Customers:


+++ History

  • 2005 - Deepwater port application filed
  • 2006 - Project cancelled

+++ Other Information

  • -

+++ Relevant Links

  1. Marad, Withdrawn and Disapproved Applications
  2. ConocoPhillips Submits Application for New Offshore LNG Terminal