Windermere Gas Field

From A Barrel Full
Revision as of 12:58, 11 June 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Ineos
  • Country: UK
  • Location:
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Windermere development is a gas producing normally unattended installation (NUI) located in SNS Block 49/09b
  • The Windermere platform is a fixed three-legged jacket
  • The platform is tied back via a 7 kilometre long 8-inch pipeline to the Centrica Energy Upstream (Centrica), operated ST-1 platform that is part of the Markham Gas Field complex

Contractors

  • -

History

  • 1996 - Development approval granted
  • 1997 - The Windermere platform was installed
  • 1997 - First gas produced
  • 2015 - Ineos acquired the field from DEA
  • 2016 - Production ceased
  • 2021 - Approval granted for decommissioning

Geology

  • A thin, basal aeolian sandstone is top-sealed by lacustrine Silverpit Formation, clay stones and sourced by the underlying Westphalian Coal Measures.

Links

  1. RWE Dea UK Environmental Report 2012
  2. UK Oil and Gas Fields by Approval Date
  3. List Of Oil and Gas Production Platforms In The UK
  4. UK Oil and Gas Field Approved Decommissioning Programmes
INEOS completes deal to acquire DEA UK North Sea gas fields