Rio Bravo Gas Pipeline

From A Barrel Full
Revision as of 09:58, 13 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: (Operating/Planned/Under Construction)

Details

  • The project consists of 137-miles of new 42-inch and 48-inch pipelines transporting natural gas from the Agua Dulce supply area to NextDecade's Rio Grande Export Terminal LNG Project in Brownsville, Texas

History

  • 2024 - Enbridge became a partner in the pipeline

Other Information

  • -

Links

  1. Enbridge to Enter into JV Connecting Permian Basin Natural Gas Supply to Growing LNG and USGC Demand