Block 51 East Al-Hajr Oil Field
Revision as of 08:47, 13 May 2024 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Nexen (CNOOC) * Country: Yemen * Location: Block 51 * Production start: 2004 * Partners: * Type: Oil * Estimated Reserves: * Production Volu...")
Summary Information
- Operator: Nexen (CNOOC)
- Country: Yemen
- Location: Block 51
- Production start: 2004
- Partners:
- Type: Oil
- Estimated Reserves:
- Production Volume:
+++ Description
- A 22 km oil pipeline connects to the Masila export pipeline
+++ Contractors
- **Kavin Engineering:** BAK Processing Facility
+++ History
- 2004 - First oil produced
+++ Geology
+++ Links