European Gas Pipeline Link (EUGAL)

From A Barrel Full
Revision as of 09:52, 10 May 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Source: Mecklenburg
  • Destination: Deutschneudorf
  • Ownership: Gascade
  • Website: https://www.gascade.de/
  • Length: 480 kilometres ( miles)
  • Capacity: per day
  • Status: Operating

Details

  • From the Baltic Sea through Mecklenburg-Western Pomerania and as far as Brandenburg, EUGAL runs in two strings; through Saxony and over the border to the Czech Republic, it runs in just one string.
  • The pipeline was built to add capacity for gas coming from the Nord Stream Gas II Pipeline
  • EUGAL interconnects with the JAGAL Gas Pipeline

History

  • 2020 - The pipeline began operating
  • 2021 - The pipeline reached full capacity

Other Information

  • -

Links

  1. Gascade, EUGAL