JAGAL Gas Pipeline
Revision as of 20:55, 9 May 2024 by Abarrelfull (talk | contribs)
Summary Information
- Source: Frankfurt am Oder, Germany
- Destination: Rückersdorf, Germany
- Ownership: Gascade
- Website: https://www.gascade.de/
- Length: 338 kilometres ( miles)
- Capacity: per day
- Status: Operating
+++ Details
- The pipeline begins at the Polish-German border near Mallnow and cover the stretch to Rückersdorf in the state of Thuringia, where it connects with STEGAL Gas Pipeline
- It links the Yamal-Europe pipeline to the German transmission system
+++ History
- 1995 - Construction of the pipeline began
- 1999 - The first gas flows through the pipeline
+++ Other Information
- -
+++ Links