Sepetiba FPSO

From A Barrel Full
Revision as of 10:34, 2 January 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

Brief Description

  • The vessel has capacity to produce up to 180 thousand barrels of oil a day and compress up to 12 million cubic meters of gas.
  • It is the second phase of the Mero development

Contractors

  • SBM Offshore: Construction, lease and operation

Status

  • In operation

History

  • 2019 - Phase 2 of the Mero development launched
  • 2023 - First oil produced

Other Information

  • -

Links

  1. Brazil: SBM Offshore signs FPSO Sepetiba contracts
  2. Petrobras puts platform vessel into pre-salt production