Jubilee Oil Field
Revision as of 17:58, 6 December 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Kosmos * Country: Ghana * Location: In the Tano Basin offshore Ghana * Production start: 2010 * Partners: Tullow, Kosmos, Anadarko, GNPC * Typ...")
Summary Information
- Operator: Kosmos
- Country: Ghana
- Location: In the Tano Basin offshore Ghana
- Production start: 2010
- Partners: Tullow, Kosmos, Anadarko, GNPC
- Type: Oil
- Estimated Reserves: 600 Million BOe
- Production Volume: 120,000 bpd
+++ Description
- One of the largest finds of 2007, it is Ghana's first oil producing field
- This field is located off the coast of Ghana at water depths ranging between 1,200 and 1,700 meters
- The [[[Kwame Nkrumah MV21 FPSO]]] is capable of processing more than 120,000 barrels of oil per day, and injecting more than 230,000 barrels of water per day and 160 MMscfd of produced gas
- A gas plant is being constructed onshore
+++ Contractors
- **Modec:** Provision and operation of FSPO
- **Sembcorp Marine:** FPSO conversion, including detailed engineering, installation and integration of 18 topside modules, installation of external turret and power generation, accommodation upgrading as well as extensive piping and electrical cabling works.
- **Technip:**
* Engineering and fabrication of seven 10-inch diameter and two 8-inch diameter risers, * engineering, fabrication and installation of approximately 48 kilometers of production and gas and water injection rigid flowlines, * Installation of 26 kilometers of umbilicals(4), nine flexible risers (supplied by Technip under the first contract) and subsea manifold and riser base structures, * Connection of the flowlines to the wellheads and subsea manifolds, * test of the entire system.
- **Aker Solutions:** FPSO installation
- **First Subsea:** Supply of the mooring connectors for the FPSO
+++ History
- 2007 - The field is discovered
- 2008 - Modec awarded FSPO contract
- 2009 - The Minister of Energy in Ghana formally approves the Jubilee field Phase 1 Development Plan
- 2009 - Technip awarded two contracts for the development of the Jubilee field
- 2010 - First oil produced in December
- 2011 - First oil exported
- 2012 - The first Jubilee Phase 1A production well was brought on stream
+++ Geology
- Upper Cretaceous structural-stratigraphic play
+++ Links
- First Oil in Ghana - Tullow Oil
- The Jubilee Field, Kosmos
- Key facts, Tullow
- Technip awarded two contracts for the development of the Jubilee field in Ghana
- MODEC Secures Award for the First FPSO Offshore Ghana
- Sembcorp Marine's Jurong Shipyard Secures FPSO Conversion Contract from MODEC
- SOFEC Selects First Subsea mooring connectors for Jubilee FPSO
- FPSO installation deal to Aker Solutions
- Tullow Oil Operational Update
- FMC Technologies Announces Subsea Services Agreement with Tullow Ghana