Poerner Refinery References
- Schwedt Refinery
- Desulphurization plant - hazop findings dk2
- Revamp of medium-pressure desulphurization plant DK2 with replacement of stripping column including foundation
- Client: PCK Raffinerie GmbH Schwedt
- Location: Schwedt, Germany
- Scope of work: Basic engineering, Detail engineering, Procurement, Construction supervision
- Commissioning: 2014
- Buna Sow Leuna Refinery
- alkylation plant
- Revamp of alkylation plant to increase alkylate yield
- Client: TOTAL Raffinerie Mitteldeutschland GmbH
- Location: Leuna, Germany
- Scope of work: Detail engineering, Procurement, Construction supervision, Commissioning
- Commissioning: 2014
- Schwechat Refinery
- rd4 program
- EPCM-Contractor for modernization of the crude oil distillation plant4 (RD4), distillation plant1 (DEA1), distillation plant2 (DEA2), new residue cooling system (RSK) to increase cooling capacity at residue line
- Client: OMV AG
- Location: Schwechat / Austria
- Scope of work: Project management, Basic engineering, Detailed engineering, Procurement, Site and construction supervision, Commissioning assistance
- Commissioning: 2014
butadiene production unit
EPCM-Contractor for capacity extensions to Butadiene production unit Client: OMV AG Location: Schwechat / Austria Scope of work: Project management Basic engineering Detailed engineering Procurement Site and construction supervision Commissioning assistance Commissioning: 2014 revamp vacuum plant
Exchange of the vacuum column of the vacuum plant based on the modern deep-cut process Client: PCK Raffinerie GmbH Schwedt Location: Schwedt / Germany Scope of work: Basic engineering Detailed engineering Procurement Construction and installation supervision Commissioning support Commissioning: 2013 propane deasphalting plant (pda)
The new PDA plant is to obtain deasphalted oil from vacuum residue by propane extraction. Client: H&R Ölwerke Schindler GmbH Location: Hamburg / Germany Scope of work: Basic engineering Detailed engineering Procurement Construction supervision Commissioning Commissioning: 2011 crude oil distillation plant 4 schwechat
EPCM-Contractor for modernizing the crude oil distillation plant 4 (RD4) in Schwechat including the modernization of the lower circulation return lines of the distillation plant Client: OMV Location: Schwechat / Austria Scope of work: Detailed engineering Procurement and expediting Construction and installation supervision Commissioning Commissioning: 2010 revamp crude oil distillation plant top1
Replacement of the main column for improvement of MD recovery and for production of a jet fuel component; replacement of column with a 1350t crane and assembly of column parts on site Client: PCK Raffinerie Schwedt Location: Schwedt / Germany Scope of work: Detailed engineering Construction and installation supervision Procurement Expediting Commissioning: 2010 revamp fcc gas concentration plant
Revamp of the stripping column with further peripheral equipment to improve the propene recovery process Client: PCK Raffinerie GmbH Schwedt Location: Schwedt / Germany Scope of work: Basic engineering Detailed engineering Procurement and expediting Construction and installation supervision Commissioning Commissioning: 2010 revamp of hds plant
Complete revamp of the desulfurization plant HDS-1 in Schwechat to reduce the sulfur production to less than 10ppm and triple the capacity from 1000 t/d to 3500 t/d by EDL Client: OMV AG Location: Schwechat, Austria Scope of work: Project management Detailed engineering Procurement Construction supervision Commissioning Commissioning: 2008 used oil re- refining plant
Planning and erection of a new used oil re-refining plant (Hylube2) based on UOP technology Client: Puralube Raffinerie GmbH Location: Zeitz, Germany Scope of work: Basic engineering Detailed engineering Procurement support Commissioning support Commissioning: 2008
fcc-overcracking-plant
FCC overcracking plant with C3 splitter process stage as the core part of the plant (diameter 5.2 m, total height 84 m) to produce propylene in polymer grade quality Client: PCK Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2007 Investment: EUR 29 million (in total) debottlenecking of refinery gas plant
Debottlenecking of refinery gas plant Client: OMV Deutschland GmbH Location: Burghausen, Germany Scope of work: Detailed engineering Procurement Construction supervision Site management Commissioning: 2007 revamp hf alkylation
Revamp of existing HF alkylation Client: PCK Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering (UOP Schedule A) Detailed engineering Procurement Construction supervision Commissioning: 2007 ok 95 - transfer line
Transfer line OK 95 (with/without ETBE) Client: TOTAL Raffinerie Mitteldeutschland GmbH Location: Leuna, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2006 revamp of hds-1 plant
Revamp of HDS-1 plant Client: OMV Deutschland GmbH Location: Burghausen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning 2006 new refinery gas plant
New refinery gas plant Modification of associated existing units Client: BAYERNOIL Raffineriegesellschaft LocationIngolstadt, Germany Scope of work: Detailed engineering Procurement (support) Authority engineering Investment cost estimate Construction supervision (piping) Acceptance tests/Tests Start-up assistance Commissioning: 2005
revamp of coking plant Project: Revamp of coking plant with capacity increase Client: BP Erdöl-Raffinerie-Emsland Location: Lingen, Germany Scope of work: Detailed engineering Procurement Construction supervision Commissioning: 2004 fcc column
Replacement of existing FCC main column by a larger (diameter of 6.2 m) and higher (height of 54 m) one Client: Raffinerie GmbH, Schwedt Location: Schwedt, Germany Scope of work: Basic engineering Detailed engineering Procurement Construction supervision Acceptance tests/Tests Start-up assistance Commissioning: 2004 revamp of light gasoline isomerization
Revamp of UOP reformer for isomerization of light gasoline based on UOP-Par Isom technology and a UOP reactor design package Location: Lingen, Germany Scope of work: Extended basic engineering Authority engineering Investment cost estimate Procurement support Detailed engineering Commissioning: 2002 desulphurization unit Desus 2
Project: Increase of throughput of desulphurization unit DESUS 2 to 140 tph Client: PCK Raffinerie GmbH Location: Schwedt, Germany Scope of work: Basic engineering Detailed engineering Procurement Construction supervision Start-up assistance Commissioning: 2002