Enterprise Aegis Ethane Pipeline
Revision as of 14:53, 25 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Mont Belvieu, Texas * Destination: Mississippi River, Louisiana * Ownership: Enterprise * Website: http://www.enterpriseproducts.com/ * Length:...")
Summary Information
- Source: Mont Belvieu, Texas
- Destination: Mississippi River, Louisiana
- Ownership: Enterprise
- Website: http://www.enterpriseproducts.com/
- Length: kilometres (270 miles)
- Capacity: 425,000 barrels per day of ethane
- Product Type: Ethane
+++ Brief Description
- The Aegis Ethane pipeline is a 270-mile pipeline system that consists of three sections:
- Section one is a 60-mile pipeline system designed to transport purity ethane from Enterprise’s Mont Belvieu, Texas liquids storage complex to Beaumont, Texas
- Section 2 connects Beaumont to Lake Charles, Louisiana
- Section 3 connects the pipeline to the Mississippi River
- It supplies petrochemical facilities in Texas and Louisiana.
- The pipeline is 20 inches
+++ Pipeline Status
- Section 1 & 2 are in operation
+++ History
- 2013 - Enterprise launches the project
- 2014 - The first stage of the pipeline is completed
- 2015 - Open season for expansion
- 2015 - Second stage completed
- 2015 - Open season for expansion
+++ Other Information
- -
+++ Links
- Enterprise Announces Gulf Coast Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise to Increase Capacity on Aegis Ethane Pipeline; Conducts Supplemental Open Season
- Enterprise Completes Initial Segment of Aegis Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise Signs Additional Commitment for Aegis Ethane Pipeline
- Enterprise Completes Second Segment of Aegis Ethane Pipeline
- Enterprise Offering Additional Capacity on Aegis Ethane Pipeline System
- Enterprise Completes Final Segment of Aegis Pipeline