Shin Oak NGL Pipeline
Revision as of 11:32, 22 September 2023 by Abarrelfull (talk | contribs)
Contents
Summary Information
2019 - - * Source: Gaines County, Texas
- Destination: Mont Belvieu, Texas
- Ownership: Enterprise
- Website: https://www.enterpriseproducts.com/
- Length: kilometres (571 miles)
- Capacity: 250,000 barrels of oil per day
- Product Type: mixed NGLs
Brief Description
- The Shin Oak NGL pipeline originates at Hobbs NGL Fractionation Center in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
- The pipeline is for NGL's from the Permian basin
- An expansion is underway which would add up to 275,000 BPD of capacity, with completion expected in the first half of 2024.
Pipeline Status
- In operation
History
- 2017 - Final investment decision
- 2019 - Pipeline enters operations
- 2019 - Altus Midstream acquired a 33% Stake
- 2022 - Expansion project launched
Other Information
- -