Shin Oak NGL Pipeline

From A Barrel Full
Revision as of 11:29, 22 September 2023 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

2019 - - * Source: Gaines County, Texas

  • Destination: Mont Belvieu, Texas
  • Ownership: Enterprise
  • Website: https://www.enterpriseproducts.com/
  • Length: kilometres (571 miles)
  • Capacity: 250,000 barrels of oil per day
  • Product Type: mixed NGLs

Brief Description

  • The Shin Oak NGL pipeline originates at Hobbs NGL Fractionation Center in Gaines County, Texas. The 24-inch diameter pipeline has an initial design capacity of 250,000 barrels per day (“BPD”), expandable to 600,000 BPD.
  • The pipeline is for NGL's from the Permian basin


Pipeline Status

  • In operation

History

  • 2017 - Final investment decision
  • 2019 - Pipeline enters operations
  • 2019 - Altus Midstream acquired a 33% Stake

Other Information

  • -

Links

  1. Enterprise to Build Shin Oak NGL Pipeline from Permian Basin to Mont Belvieu, Texas
  2. Enterprise Begins Service on Shin Oak NGL Pipeline
  3. Altus Midstream Acquires Stake in Enterprise’s Shin Oak Pipeline