Clair Ridge Oil Field
Revision as of 07:48, 15 May 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: BP * Country: UK * Location: west of Shetland * Production start: * Partners: Shell, ConocoPhillips and Chevron * Type: Oil / Gas * Estimate...")
Summary Information
- Operator: BP
- Country: UK
- Location: west of Shetland
- Production start:
- Partners: Shell, ConocoPhillips and Chevron
- Type: Oil / Gas
- Estimated Reserves: 640 million barrels of recoverable oil
- Production Volume:
+++ Description
- Clair Ridge is a £4.5bn development announced by BP and its coventurers ConocoPhillips, Chevron, and Shell in October 2011. It is an extension of the giant [[[Clair Oil Field]]]
- It is expected to come onstream in 2016 and produce up to 120,000 barrels of oil per day at peak.
- The Clair Ridge development, is the first sanctioned large-scale offshore enhanced oil recovery (EOR) scheme using reduced salinity water injection (LoSal® EOR).
- Oil and Gas are to be transported from Clair Ridge to [[[Sullom Voe Oil Terminal]]]
+++ Contractors
- **AMEC:**
- Detailed engineering and project management services for the construction and installation phase of two new bridge linked platforms.This includes detail design, follow-on engineering, site support, plus procurement, supply chain services, materials management and information management services for the whole project
- Hook up and commissioning services (HUC) for the two Clair Ridge platforms
- **Kvaerner:** Drilling & Production Jacket and Piles, Quarters Utility Jacket and Piles
- **Subsea 7:** project management, engineering, procurement, fabrication and installation of a 6km 22” oil export pipeline and a 14km 6” gas export pipeline connected to the new production facilities and existing Clair Phase 1 export systems
- **Hyundai Heavy Industries:** Construction of platform topsides
- **Global Marine:** Submarine fibre optic link between platforms
+++ History
- 2011 - BP Confirms Extension of Giant Clair Field
- 2011 - The Government gave BP and its partners Shell, ConocoPhillips and Chevron consent for the project
- 2011 - AMEC awarded EPMS for the main platform design
- 2012 - Subsea 7 awarded pipeline contract
- 2012 - BP announces reduced salinity water injection project
- 2013 - Clair Ridge Jackets Safely Installed
+++ Geology
+++ Links
- Foundocean Subsea References
- Kvaerner Platform References
- BP Confirms Extension of Giant Clair Field West of Shetland in the UK
- Consent given for £4.5 billion Clair Ridge development
- AMEC awarded £150 million Clair Ridge design engineering, North Sea
- Subsea 7 awarded contract, West of Shetland
- BP Technology Boosts Oil Recovery Adding To Potential Energy Supplies
- AMEC awarded £68 million Clair Ridge hook up contract, North Sea
- New Clair Ridge Jackets Safely Installed West Of Shetland
- Global Marine lands Subsea 7 contract