Arabiyah and Hasbah Gas Fields

From A Barrel Full
Revision as of 22:00, 17 January 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Saudi Aramco * Country: Saudi-Arabia * Location: Eastern Province * Production start: * Partners: * Type: Gas * Estimated Reserves: * Produc...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: Saudi Aramco
  • Country: Saudi-Arabia
  • Location: Eastern Province
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The development includes 12 wellhead platforms, 2 tie-in platforms and 1 injection platform
  • Gas is transported to shore by a 36 inches 260-kilometres-long export trunkline
  • The gas is to be processed in the [[[Wasit Gas Processing Plant]]]

+++ Contractors

  • Saipem: The complete development of the two fields
* Engineering, procurement, fabrication and installation of a total of 12 wellhead platforms, 2 tie-in platforms and 1 injection platform, besides to a 36 inches 260-kilometres-long export trunkline and approximately 200 kilometres of mono-ethylene glycol (MEG) pipelines, 200 kilometres of subsea electric and control cables and 40 kilometres of offshore flowlines. 
* The scope of work also includes the shore approaches and about 120 kilometres of onshore pipelines.

+++ History

  • 2011 - Saipem awarded EPCI contract

+++ Geology

+++ Links

  1. [[[Saipem Fixed Offshore Production Facilities Project References]]]
  2. [[[Saipem Pipeline References]]]
  3. Saipem wins new E&C Offshore contracts worth in excess of $2.2 billion