Sierrita Gas Pipeline

From A Barrel Full
Revision as of 10:59, 30 December 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Source: Tucson, Arizona * Destination: Sasabe, Arizona * Ownership: Kinder Morgan * Website: www.kindermorgan.com * Length: kilometres (60 mile...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Source: Tucson, Arizona
  • Destination: Sasabe, Arizona
  • Ownership: Kinder Morgan
  • Website: www.kindermorgan.com
  • Length: kilometres (60 miles)
  • Capacity: 200 million cubic feet per day
  • Status: Operating

Details

  • The pipeline extends from El Paso Natural Gas’ existing south mainlines near Tucson, Arizona, to the U.S.-Mexico border near Sasabe, Arizona, a distance of

approximately 60-mile

  • It is a 36-inch diameter pipeline provides with approximately 200 million cubic feet per day of firm transportation capacity
  • The Sierrita Pipeline interconnects via an international border crossing with a natural gas pipeline in Mexico.

History

  • 2014 - The pipeline entered service

Other Information

  • -

Links

  1. []