Anning and Somerville Gas Fields

From A Barrel Full
Revision as of 10:28, 5 November 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Operator: * Country: UK * Location: Southern North Sea * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production V...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator:
  • Country: UK
  • Location: Southern North Sea
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The development concept consists of six production wells from two wireline capable Normally Unmanned Installation (NUI) platforms at Anning and Somerville.
  • These platforms will then connect via a subsea pipeline to third party infrastructure for onward transportation and processing to entry into the UK gas network
  • Final Investment Decision (FID) is expected in 2023 and first gas in late 2024