Greece-Bulgaria Interconnector ICGB

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source:
  • Destination:
  • Ownership:
  • Website:
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: (Operating/Planned/Under Construction)

Details

  • The IGB gas pipeline is connected with the Greek national gas transmission system in the area of Komotini and with the Bulgarian national gas transmission system in the area of Stara Zagora.
  • The length of the pipeline is 182 km, the pipeline diameter will be 32” and the capacity is 3 bcm/y in the direction from Greece to Bulgaria.
  • The pipeline is designed to enable its capacity to be increased up to 5 bcm/y and for reverse flow, if market demand is there.
  • The connector enables Bulgaria to be supplied with gas from the Trans-Adriatic Pipeline TAP and also the Alexandroupolis LNG Terminal when it is completed

History

  • 2022 - Construction of the pipeline completed

Other Information

  • -

Links

  1. []