Moscow Refinery Euro V+ Project

From A Barrel Full
Jump to navigation Jump to search

Summary Information

The Project

  • Project Type: Upgrade
  • Project Summary:
  • Main Contractors

Refining Units

  • Vacuum distillation unit
  • Fluidised catalytic cracker

Terminal Capacity

  • Crude Oil:
  • Refined Products:

Crude Supply

  • -


Products Produced

  • The project will result in more gasoline and less residual fuel oil

History

  • 2017 - The VDU was delivered to the site
  • 2020 - The project was completed

Other Information

  • -

Links

  1. Russian-Produced Equipment For Construction Of A Euro+ Refining Facility At Gazprom Neft’s Moscow Refinery Is Delivered To Moscow