Kazakhstan IPCI Petrochemical Project

From A Barrel Full
Revision as of 15:39, 20 October 2020 by Abarrelfull (talk | contribs) (→‎Links)
Jump to navigation Jump to search

Summary Information

  • Owner: KPI (Kazakhstan Petrochemical Industries)
  • Website: https://www.kpi.kz/en/
  • Location: Aytaru, Kazakhstan
  • Completion: 2022 expected

Project Details

  • The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology.
  • The second phase will add an ethane cracker and polyethylene production

Contractors

  • Hualu Engineering & Technology Co: Construction
  • CB&I: process licences

History

  • 2013 – Petrofac consortium awarded EPC contract
  • 2017 – CB&I awarded process licences
  • 2017 – Ground breaking ceremony
  • 2020 - Major equipment installed

Links

  1. Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan
  2. CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan
  3. The Groundbreaking Ceremony of IPCI project in Kazakhstan
  4. Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place