Pluto Gas Field
Summary Information
Operator: Woodside Country: Australia Location: 190 kilometers northwest of Karratha, offshore Western Australia Production start: 2012 Partners: Type: Gas Estimated Reserves: Production Volume: Description
Gas from the field is used to supply the Pluto LNG Terminal The offshore platform is a four-leg extended base tower with a launch weight of 10,000 metric tons Contractors
CSE: Pluto Jacket Ramunia: Topsides fabrication TH Heavy Engineering: Topsides fabrication J. Ray McDermott: Installation engineering, transportation and installation of the complete platform FMC Technologies: Five subsea trees, related control and tie-in systems and two production manifolds Acergy: installation of subsea manifolds, valve structures, umbilicals, a monoethylene glycol injection line and pipeline stabilisation as well as the tie-in of flowlines Aker Solutions: Hydrate Inhibition, Conceptual Study & FEED History
2005 - Pluto Gas Field discovered 2007 - FMC Technologies awarded subsea equipment contract 2008 - J. Ray McDermott awarded platform contract 2008 - Acergy awarded offshore installation contract 2012 - Gas production starts Geology
Links
McDermott Platform References TH Heavy Engineering Platform References Aker Solutions Hydrate Inhibition References International Protective Coatings Fixed Platform References FMC Technologies to Supply Subsea System for Woodside's Pluto Project, Offshore Western Australia Acergy S.A. announces $150 million deepwater contract award in Australia J. Ray McDermott Awarded Pluto Offshore Platform Contract Pluto Begins LNG Production