Barrancabermeja Refinery Upgrade Project

From A Barrel Full
Revision as of 06:20, 7 April 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Ecopetrol Website: http://www.ecopetrol.com.co/ Wiki Page: Barrancabaermeja Santander Refinery Location: Barrancabermeja, Colombia Capacity: Bef...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: Ecopetrol Website: http://www.ecopetrol.com.co/ Wiki Page: Barrancabaermeja Santander Refinery Location: Barrancabermeja, Colombia Capacity: Before: 12.5 million tons/annum & 250,000 bbl/day After: 15.0 million tons/annum & 300,000 bbl/day Nelson Complexity: Project Stage: Completed Expected Completion: 201x Budget: US$1.023 billion The Project Project Type: Major Upgrade and Expansion Project Summary: The project will increase refining capacity from 250,000 barrels per stream day (BPSD) to 300,000 BPSD, add heavy crude processing capability, and provide a processing configuration to meet the projected 2013 Colombian clean fuels product specifications. The scope includes the following new units: a crude unit, delayed coker, hydrocracker unit, coker naphtha hydrotreating unit, hydrogen unit, sour water strippers, amine regeneration unit, and sulfur recovery unit, plus associated utilities and offsite units. The project will also include revamps to the diesel hydrotreater, gasoline hydrotreater and dismantling of two existing atmospheric and vacuum distillation units. In addition, the contract includes the procurement of long-lead items. Main Contractors: Foster Wheeler - Front-end engineering design (FEED) and project management consultancy (PMC) contract Additional project management consultancy (PMC) and front end engineering design (FEED), detailed engineering for the crude unit revamps, assisting Ecopetrol in the selection process for engineering, procurement and construction (EPC) contracts, and control and supervision of the EPC and construction contractors. Licences Technip: Hydrocracking and Coker Naphtha Hydrotreating Refining Units Crude Unit Hydrocracker - 80,000 bpd Coker Naphtha Hydrotreater - 14,000 bpd Delayed Coker hydrogen unit, sour water strippers, amine regeneration unit, sulfur recovery unit Terminal Capacity Crude Oil: Refined Products: Crude Supply The PRMB will add heavy crude processing capability to take advantage of the available domestic heavy sour crudes Products Produced The project will provide a processing configuration to meet the Colombian clean fuels product specifications. This upgrade to the refinery will eliminate fuel oil production History 2008 - Foster Wheeler Wins awarded a front-end engineering design (FEED) and project management consultancy (PMC) contract 2011 - Eximbank awarded $1 Billion worth of loans to the project 2011 - The Board of Directors of Ecopetrol made the final investment decision 2012 - Axens technology chosen for Hydrocracking and Coker Naphtha Hydrotreating Other Information -

Links

  1. Foster Wheeler Wins Major Refinery Upgrade Contract in Colombia
  2. Ex-Im Bank Approves Nearly $1 Billion in Financing To Back U.S. Exports to Colombia's Ecopetrol
  3. Foster Wheeler Gears up for Second Phase of the Barrancabermeja Refinery Modernization Project
  4. Ecopetrol Selects Axens’ Hydrocracking and Coker Naphtha Hydrotreating Technologies