SIMECO Refining References
Turn Key
- Sannazzaro de Burgondi Refinery
- Italy
 - ENI S.p.a Div. R&M
 - New Vacum Column & Automatic Filtration System on the existing FCC Plant
 - 11.000.000
 - 2011 -in progress
 
 - Taranto Refinery
- Italy
 - ENI S.p.a Div. R&M
 - Liquid Sulfur Transferline from Refinery Storage to Unit producing Solid Chips
 - 1.100.000
 - 2010
 
 - Sannazzaro de Burgondi Refinery
- Italy
 - ENI S.p.a Div. R&M
 - C4 Butylene Stream Dryer Package: Engineering, Material Supply and Construction up to Pre-commissioning
 - 8.500.000
 - 2008-2009
 
 - Sarroch Refinery
- Italy
 - POLIMERI EUROPA
 - W.W.T. Covering System and Hydrocarbon Separation Unit by Cryogenic Condensation System in Sarroch Petrochemical Complex
 - 6.000.000
 - 2007-2008
 
 - Milazzo Refinery
- Italy
 - ENI S.p.a Div. R&M
 - Marine Loading Arms revamping & replacement on Pier 2 – Mooring 06 bis of the Milazzo Refinery
 - 2.800.000
 - 2007
 
 - Milazzo Refinery
- Italy
 - ENI S.p.a Div. R&M
 - Pier 2-Marine Loading Arms revamping: n.4x16” loading arms dismantling and replacement of the Milazzo Refinery Terminal
 - 3.000.000
 - 2005
 
 - Gela Refinery
- Italy
 - New Instrumentation System (DCS) for Waste Water Treatment Unit
 - 1.400.000
 - 2004
 
 
AGIP GAS
Railway Loading Arms extension for GPL storage and supply of underground tanks for the Livorno Storage Facilities 3.800.000 2000
Engineering
- Milazzo Refinery
- Italy
 - ENI S.p.a Div. R&M
 - KEROSENE DESULPHURIZATION UNIT
 - Front End Engineering Design for Revamping of HDS1 Unit / Raffineria di Milazzo
 - 10.000
 - 2013
 
 - Leghorn Livorno Refinery
 
TREATED DEASPHALTED AROMATIC EXTRACT Extended Basic Design Package for a New TDAE Unit / ENI R&M Div., Livorno Refinery (Italy) 10.000 2013 W.W.T. for Water Re-use Multidiscipline Engineering Design for a New Waste Water Treatment Package / ENI S.p.A. Div. R&M 18,000 2011-2012 OFFSHORE PLATFORMS Front End Engineering Design for n° 3 new gas platforms located offshore Adriatic Sea (Italy) and the relevant +/- 15% Cost Estimate /ENI S.p.a E&P Div. 50.000 2010-2011 COMBINED HEAT & POWER PLANT Front End Engineering Design, +/- 15% Cost Estimate and preparation of EPC Tender Documents for Power Plant Revamping located in Bolgiano, San Donato Milanese (Italy) / ENIPOWER. 18.000 2010 RESIDUE HYDROCRACKER Multidiscipline Engineering Design of EST Project- ENI R&M Div. in Sannazzaro Refinery in Italy / SAIPEM S.p.A. 220.000 2009-2012 AMMONIA PLANT/ UTILITY UNITS Multidiscipline Engineering Design of QAFCO5 Project in Qatar/SAIPEM S.p.A. 170.000 2008
OFFSHORE AND MARINE TERMINALS Conceptual Design, Basic Design & FEED for Trans-anatolian Pipeline , Samsun and Cehyan Marine Terminal Oil Storage Facilities in Turkey/ SNAMPROGETTI S.p.A. 90.000 2006-2007
WATER INJECTION SYSTEM , POWER GENERATION PLANT & UTILITY PACKAGES
* Libya * ENI Oil Co. Ltd * Water Injection System & Power Generation Plant Multidiscipline Engineering Design and ITB for EPC of the Elephant Oil Field at the Murzuk Basin * 25.000 * 2005
HYDROFINISHING UNIT & OFFSITE REVAMPING Multidisciplinary Engineering Design of the Lubricants Re-refining Plant -Lodi (Italy)/ VISCOLUBE S.p.A. 50.000 2003