Valley Crossing Gas Pipeline
Revision as of 16:59, 18 December 2025 by Abarrelfull (talk | contribs)
Summary Information
- Source: Agua Dulce, Texas
- Destination: Gulf of Mexico east of Brownsville
- Ownership: Enbridge
- Website: https://www.enbridge.com/
- Length: kilometres (168 miles)
- Capacity: 2bcf per day
- Status: (Operating/Planned/Under Construction)
Details
- 168-mile line running from the Agua Dulce Natural Gas Hub, Texas, to the Gulf of Mexico east of Brownsville with the capacity to move up to 2.6 billion cubic feet a day (Bcf/d) of natural gas south of the border.
- It connects with the
History
- 2018 - The pipeline began operations
Other Information
- -