Thunder Hawk Oil and Gas Field
Revision as of 06:44, 5 September 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: Murphy Oil * Country: USA * Location: Mississippi Canyon Block 734 in the Gulf of Mexico * Production start: 2009 * Partners: Murphy Oil - 37.5...")
Summary Information
- Operator: Murphy Oil
- Country: USA
- Location: Mississippi Canyon Block 734 in the Gulf of Mexico
- Production start: 2009
- Partners: Murphy Oil - 37.5%, ENI - 25%, Statoil - 25%, Marubeni - 12.5%
- Type: Oil & Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- A semi-submersible floating production unit with production capacity of 45,000 barrels of oil per day and 70 million cubic feet per day of natural gas is being utilized.
- The field will initially produce from three subsea wells connected via flow lines to the facility, which is installed in 6,050 feet of water
- The Big Bend & Dantzler Fields are to be tiedback to Thunder Hawk
- The Big Bend field is 18 miles from the Thunder Hawk platform in 7,200 feet of water in Mississippi Canyon Block 698
- The Dantzler field is 7 miles from the Thunder Hawk platform in 6,580 feet of water in Mississippi Canyon Block 782
+++ Contractors
- **SBM Offshore:** Supply and operation of Semi-submersible production unit
- **Kiewit:** Semi-submersible hull construction
- **Derescom:** Glycol regeneration package, 60mmscfd, 1,960psig operating pressure
- **Aker Kvaerner:** Installation of the spread mooring system, transportation and hook up of the FPU
- **First Subsea:** Installation of the twelve mooring connectors
++++ Big Bend & Dantzler
- **EMAS AMC:** Engineering, procurement, construction and installation of subsea tie-backs
+++ History
- 2004 - Thunder Hawk Oil And Gas Field discovered
- 2005 - Hydro acquires a 25% stake
- 2006 - Marubeni acquired a stake from Pioneer
- 2007 - Eni acquired 25% stake from Dominion resources
- 2009 - Production commences
- 2014 - SBM signed production handling agreement for the Big Bend & Dantzler Fields
- 2015 - W&T Offshore Announces First Production at Big Bend
+++ Geology
+++ Links
- Gulf Of Mexico Permanent Deepwater Structures
- Gulf Of Mexico Discoveries In Water Depths Greater Than 5000
- Derescom Oil And Gas Processing References
- Dominion Exploration & Production Announces Discovery at Thunder Hawk
- Hydro and Spinnaker: A perfect fit
- Pioneer Closes Sale of Deepwater Gulf of Mexico Assets
- Eni completes the acquisition of Dominion's assets in the Gulf of Mexico
- Aker Kvaerner secures another floater installation contract in Gulf of Mexico
- First Subsea Completes Thunder Hawk Mooring Connections
- Murphy Oil Announces First Production At The Thunder Hawk Field In The Gulf Of Mexico
- SBM Offshore Announces Thunder Hawk Tiebacks
- Ezra's Subsea Services Division Finalises Triple Contract Signings With Noble Energy For Subsea Tie-Back Projects In The US Gulf Of Mexico
- Ezra's Subsea Services Division, EMAS AMC's Lewek Constellation Completes Inaugural Reel Lay Projects
- W&T Offshore Announces First Production at Big Bend Field