Skikda Refinery Project

From A Barrel Full
Revision as of 17:33, 9 March 2020 by Abarrelfull (talk | contribs) (Created page with "Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: Skikda Refinery Location: Skikda, Algeria Capacity: Before: 7.5 million tons...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information Ownership: Sonatrach Website: http://www.sonatrach-dz.com/ (French) Wiki Page: Skikda Refinery Location: Skikda, Algeria Capacity: Before: 7.5 million tons/annum & 150,000 bbl/day After: 16.5 million tons/annum & 330,000 bbl/day Nelson Complexity: Project Stage: Under construction Expected Completion: 2013 Budget: $2.6 Billion The Project Project Type: Major expansion and upgrade of an existing refinery Project Summary: From the crude distillation unit to the aromatic facilities, the contract covers most of the refinery complex. Through its rehabilitation and modernization, the largest refinery plant in Algeria will have its refining capacity increased up to 330,000 BPSD. In addition, the contract includes new plants for the production of Isomerate (700,000 MTPA), Para-Xylene (220,000 MTPA) and Benzene (200,000 MTPA). Main Contractors: Samsung Engineering: will perform engineering, procurement and construction services on a lump-sum turn key contract basis, with bulk materials and construction costs to be settled on a reimbursable contract basis EIL: PMC services Refining Units Atmospheric Distillation Isomerisation Terminal Capacity Crude Oil: Refined Products: Crude Supply Domestic Algerian Crude Products Produced - History 2009 - Samsung Engineering awarded engineering, procurement and construction contract Other Information - Relevant Links Samsung Engineering wins a 2.6 bn USD order from Algeria EIL Secures Project Management Consultancy Contract from NAFTEC, Algeria Skikda Refinery Contract Awarded (French)