Payara Oil Field
Revision as of 14:23, 14 November 2023 by Abarrelfull (talk | contribs)
Summary Information
- Operator: Exxon
- Country: Guyana
- Location: Stabroek Block, Offshore
- Production start:
- Partners: Esso - 45 %, Hess - 30 % and CNOOC - 25 %
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
- The development utilizes the Prosperity FPSO with production capacity of 220,000 gross barrels of oil per day
- Production will be ramped up until the middle of 2024, by adding more wells.
Contractors
- TechnipFMC: Manufacture and delivery of the subsea production system, including 41 enhanced vertical deep water trees and associated tooling, six flexible risers and ten manifolds along with associated controls and tie-in equipment.
- Keppel: FPSO integration and topsides manufacture
History
- 2023 - First oil produced
- 2023 - Chevron agreed to acquire Hess, becoming a partner
- 2023 - First oil produced