Freeport LNG Terminal
Revision as of 07:32, 4 June 2021 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information ===  * Ownership: Freeport LNG  * Dow, Zachry, Osaka Gas, * Website: http://www.freeportlng.com/ * Location: Quintana Island in Texas  * Capacity: 4.4...")
Summary Information
- Ownership: Freeport LNG
 
* Dow, Zachry, Osaka Gas,
- Website: http://www.freeportlng.com/
 - Location: Quintana Island in Texas
 - Capacity: 4.4 million tons/annum per train (Total 3)
 - Status: Planned
 
+++ Brief Description
- A three train liquifaction plant, it is to be built in stages
 - The project is a conversion of the [[[Freeport Lng Terminal]]], which is a regasification terminal
 
+++ Technical Details
- Storage capacity:
 - Constructor:
 
* **CB&I and Zachry:** Front-end engineering and design on the liquefaction terminal * **CB&I and Zachry:** Engineering and procurement services
- **GE:** Supplying the main refrigeration compressors, variable-speed drive electric motors and other electrical equipment for two LNG liquefaction trains
 - Licensor: [[[Lng Terminals Using Air Products Technology | Air Products]]] for all three trains
 
+++ Ongoing Projects/Project Status
- Commissioning is expected in [[[LNG Terminals to be Completed in 2018 | 2018]]]
 
+++ Suppliers / Customers
- Suppliers: Gas is to be supplied by the [[[Gulf South Gas Pipeline System]]] & [[[Tejas Gas Pipeline]]]
 - Customers:
 
* Osaka Gas and Chubu Electric, the Japanese utilities have acquired rights to the 4.4 mtpa production capacity of the first train at Freeport over an initial 20-year term * BP will supply gas to PTT
+++ History
- 2011 - The project received approval from DOE to export LNG to Free Trade Agreement countries
 - 2012 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract
 - 2012 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With Osaka Gas And Chubu Electric
 - 2013 - Energy Department Authorizes Export of LNG
 - 2013 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With SK And Toshiba
 - 2013 - EPC contract signed
 - 2014 - Draft EIA report published
 - 2014 - Final EIA report given by FERC
 - 2015 - Financing completed for the 3rd train
 
+++ Other Information
- -
 
Links
- Macquarie Energy and Freeport LNG Expansion, L.P. to Jointly Develop U.S. LNG Export Project
 - Freeport LNG’s Liquefaction and Export Project
 - Freeport LNG and Zachry/CB&I JV Sign FEED Contract for Development of Freeport Liquefaction Project
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreements With Osaka Gas And Chubu Electric
 - Energy Department Authorizes Second Proposed Facility To Export Liquefied Natural Gas
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreement With SK E&S LNG
 - Freeport LNG Signs 20-Year Liquefaction Tolling Agreement With Toshiba Corporation
 - CB&I Awarded Contract for LNG Liquefaction Terminal
 - FERC Staff Issues Draft Environmental Impact Statement on Freeport LNG
 - FERC issues final Environmental Impact Statement on the Liquefaction and Phase II Modification
 - Freeport LNG Selects GE for Major North American LNG Export Project
 - Air Products’ LNG Technology and Equipment Selected for Freeport Terminal Facility
 - Freeport LNG Closes Financing And Commences Construction Of Initial Two Natural Gas Liquefaction Trains
 - Freeport LNG Closes Financing and Starts Construction of Third Liquefaction Train
 - Air Products’ LNG Technology and Equipment Picked Again for Freeport LNG Terminal Facility
 - BP and PTT sign LNG sale and purchase agreement