UniversalPegasus Compression Stations References
Revision as of 19:15, 30 December 2024 by Abarrelfull (talk | contribs)
Major Projects – Compressor & Pump Stations (U.S. & Canada)
Compressor Stations
- Alliance Gas Pipeline
- Alliance Pipeline – Compression Facilities
- UniversalPegasus provided engineering, design, drafting and material procurement services for seven grass roots natural gas compressor stations and five meter delivery stations on the 888 mile, 36” diameter U.S. Portion of the Alliance Pipeline.
- The pipeline runs from Fort St. John, British Columbia to its associated NGL Plant at Tampico, Illinois, near Chicago. A total of 663,000 BHP of gas compression capability was included in the design package. The services included the preparation of the design basis manual, the project procedures manual, the project procurement manual; assistance in compressor station site selection; preparation of site layouts and plot plans, P&IDs, line lists, instrument lists,
construction drawing packages for the civil/structural, process/mechanical, and electrical/instrumentation systems, material specifications and construction specifications; and provided vendor shop inspection, construction management and engineering support.
- Gulf Crossing Gas Pipeline Company
- Boardwalk Pipeline Partners -‐ Gulf Crossing Pipeline Project
- UniversalPegasus provided survey, engineering design, mapping, drafting and project management for 357 miles of 42” high pressure natural gas pipeline extended from Sherman, Texas to Tallulah, Louisiana.
- The project also included two compressor stations in Texas and two compressor stations in Louisiana and five meter stations for the measurement and delivery of gas transported within the new pipeline system.
- Carter Creek Gas Processing Plant
- Chevron -‐ Carter Creek Gas Booster Compression Station Project
- UniversalPegasus performed the engineering design, equipment specifications and selection, bid
preparation, review and procurement, design and routing of all electrical components together with the 3-‐D Modeling and Isometric pipe drafting for Chevron's Carter Creek Compressor Station upgrade in Wyoming.